Conducting land Survey at existing LC locations, Subsoil Investigation, GAD preparation and preparation of detailed estimate for Proposed Construction of ROB/RUB in lieu of existing Level crossings of Palakkad Division of Southern Railway in Kerala.

Corrigendum